S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Provision for Display Board | 1 | 5000 | 5000 |
2 | Provision for Temp. Rest Shed | 1 | 11909 | 11909 |
3 | Jungle clearance i/c clearance of bushes, cutting of shrubs of rigth size less than 30 cm measured ... | 150 | 150 | 22500 |
4 | Transplanting muloching, intercultural operation etc | 59 | 209 | 12331 |
5 | Planting out seedlings to pits... | 46 | 209 | 9614 |
6 | Mates Remuneration | 7 | 400 | 2800 |
7 | Refilling of planting pits with the dug out soil after proper weathering and breaking of clods for pits @75 pits/MD | 39 | 209 | 8151 |
8 | Cost of plant | 3000 | 25 | 75000 |
9 | Making of bamboo basket (tree guard) in the shape of frustum (Diameter 60 cm. at bottom and 90 cm. at the top height 120-150 cm.) and fixing the same around the plant 4 moubi bamboo to be provided. | 986 | 209 | 206074 |
10 | Digging of planting pits (the dug out soil to be heaped near the pits up hillsides) for pits of size (c) 60cm x 60cm x 60cm | 423 | 209 | 88407 |
11 | Cost of Planting Materials (Seedling), transportation charges to the Work site. | 15 | 6000 | 90000 |