State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: DEWAS
Work Code: 1713004012/RC/22012034202243 (Ts no 1637 खेत सडक बाणसागर नहर सडगू से देवास लालगा)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2013 Work start date : 2/2/2014
Present status : Earthern road Proposed Status : Bitumen Top
Tech Sanction Details
Technical Sanction No. : 1637/12 Sanction Date : 10/1/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
606000 405000 0 0 135000 0 0 540000 0 1146000
Financial Sanction Details
Financial\Administrative Sanction No: 18/12 Financial\Administrative Sanction Date 11/1/2014
Fin. Sanc. Amt. (in Rs) NREGA:1011000 Panchparmeshwar
135000
Scheme 2
0
Scheme 3
0
Total
1146000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises51201.68192
2Dag-beling-Single spade stroke minimum 75mm deep24000.2480
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)28.6063007.586032.545
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)5.4972343.812883.8686
5Transportation of metal 2719.210.528551.6
6Transportation of metal 2103.26102.69215983.7694
7Transportation of metal 465.56223.56104080.5936
8Transportation of metal 123.6295.5636531.216
9Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia20964.419288
10Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making1470.8421.531623.06
11Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor1367.842331460.32
12Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)465.5639.618436.176
13Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:123.6578.371477.88
14Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work1470.8481.2119432.208
15Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti30.95797.63021.4032
16Collection of puddle earth including stacking at quarry2198.02112.8247936.656
17Collection of hard moorum including stacking at quarry.370.8130.848500.64
18Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 With Reinforced cement concrete (i) 5th Kilometre Stone (precast) (ii) Ordinary Kilometer Stone (Precast) (iii) 200 m stone (precast)614698814
19SIGN BOARD120002000
20contingency11400014000
21Labour difference in case of old SoR25014636500
Total Activity 1146000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work1470.8416.824710.112
2Compaction of GSB123.6391.4848386.928
3Compaction of Selected soil1367.8419.827083.232
4contangency and work charges12200022000
5Convergence Amount1135000135000
6HumePipes13500035000
7soil transportation2103.2663.27133073.2602
8Tran. water lead2719.210.528551.6
9transportation of hard muram 1465.56184.1485728.2184
Total Material 540000