S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 4000 | 1.4 | 5600 |
3 | Dag-beling-Single spade stroke minimum 75mm deep | 1142 | 0.2 | 228.4 |
4 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 1 | 191000 | 191000 |
5 | Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN | 297 | 65.9 | 19572.3 |
6 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 2536 | 22.3 | 56552.8 |
7 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 2536 | 67.8 | 171940.8 |
8 | Collection of hard moorum including stacking at quarry. | 297 | 109.3 | 32462.1 |
9 | contingency | 1 | 20365 | 20365 |
10 | Earth work in excavation in foundation including all leads and lifts including rough dressing and breaking clods deposited the excavated materials away from work site. | 0 | 0 | 0 |