State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: MANGLIYA
Work Code: 1719006010/LD/3799428848 (gramin kridangan (khel medan samtalikaran) ps ms mangliya)
Work Category: Playground
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2013 Work start date : 1/4/2014
Present status : NEW Proposed Status : Play Ground
Tech Sanction Details
Technical Sanction No. : 10/03 Sanction Date : 27/1/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
358770 122977 0 0 0 0 0 123000 0 481747
Financial Sanction Details
Financial\Administrative Sanction No: 10/05 Financial\Administrative Sanction Date 7/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:481747 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
482000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises5675.21.69080.32
2Transportation of metal 1473.0623.9435265.0564
3Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1473.0639.4258068.0252
4Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.1473.064160395.46
5Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making1473.0650.273947.612
6Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work517.510855890
7Collection of soft moorum including stacking at quarry.1473.06112.8166161.168
8work charge191769176
9contingency11376413764
Total Activity 482000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work1473.0650.273947.612
2contengency11376413764
3Transportanion of Soft Muram1473.0623.9435265.0564
Total Material 123000