S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 1912.5 | 7.02398431372549 | 13433.37 |
2 | Providing stone chips under stone pitching | 576 | 457.812725694444 | 263700.13 |
3 | (a) Other then black trap Basalt or granite | 264.15 | 313.729244747303 | 82871.58 |
4 | (a) Consolidation of Moorum /earth work (rate for 1Cum. of Moorum /earth work) | 2903.85 | 2.52450023245002 | 7330.77 |
5 | (III) 1.5 Km. Lead | 2903.85 | 106.655478072214 | 309711.51 |
6 | (a) Boulders | 267.3 | 598.843509165731 | 160070.87 |
7 | For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc. | 170.1 | 452.889770723104 | 77036.55 |
8 | Hearting, casing/cut off filling soil etc.
At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete. | 2903.85 | 21.934166709713 | 63693.53 |
9 | b (iii) Dense or hard soil for Tank Work | 1004.062 | 144.074997360721 | 144660.23 |
10 | c (iii) Hard moorum for Tank Work | 1820.138 | 191.907899291153 | 349298.86 |
11 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 44.85 | 609.846376811594 | 27351.61 |