S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 800 | 0.5 | 400 |
2 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 198 | 21.9 | 4336.2 |
3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 132.72 | 35.8 | 4751.376 |
4 | Labour only for item no. 0404 | 8.1 | 29.8 | 241.38 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 1.54 | 1860.3 | 2864.862 |
6 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 62.871 | 1043.6 | 65612.1756 |
7 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand) | 3.55 | 1670.8 | 5931.34 |
8 | Labour only for item no.0518 | 0.95 | 3120.9 | 2964.855 |
9 | Add extra for brick masonry circular in plan, I/c wells to a mean radius not exceeding 6m (Such as well stening and other similar type of works) | 67.11 | 265.5 | 17817.705 |
10 | Add to item no.0605 and 0609 for well staining-For every 3meter up to 15 meter depth. | 98.65 | 172.3 | 16997.395 |
11 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:3 (1cement, 3sand)-Ruled pointing | 20.15 | 85.1 | 1714.765 |
12 | Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading - 1 (Size ranging from 90 mm to 45 mm) | 8.1 | 240.6 | 1948.86 |
13 | Labour only for boulder soling hand packed excluding consolidation. | 8.1 | 106.2 | 860.22 |
14 | Labour only for spreading, hand packing, and levelling to gradient and required camber as per MOST 2004 clause 404.3.3 of metal, grade-1 As per MOST 2004 clause 400.2.5 including dressing. | 8.1 | 72.9 | 590.49 |
15 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 42.39 | 46.6 | 1975.374 |
16 | Earth work for well excavation including disposal of excavated soil lead upto 20 m. & lift upto 1.5 m., disposed soil to be levelled and neatly dressed. Loose or soft soil. Li1.5 m. to 2.00 m.ft from | 14.13 | 66.6 | 941.058 |
17 | Earth work for well excavation-Soil lift from 2.00 m. to 2.50 m. | 14.13 | 71.5 | 1010.295 |
18 | Earth work for well excavation-soil lift from 2.50 m. to 3.00 m. | 14.13 | 76.4 | 1079.532 |
19 | Earth work for well excavation-Soil lift from 3.00 m. to 3.50 m. | 14.13 | 81.3 | 1148.769 |
20 | Earth work for well excavation-Soil lift from 5.50 m. to 6.00 m. | 14.13 | 124.3 | 1756.359 |
21 | Earth work for well excavation-Soil lift from 3.50 m. to 4.00 m. | 14.13 | 86.2 | 1218.006 |
22 | Earth work for well excavation-Soil lift from 4.00 m. to 4.50 m. | 14.13 | 91.1 | 1287.243 |
23 | Earth work for well excavation-Soil lift from 4.50 m. to 5.00 m. | 14.13 | 96 | 1356.48 |
24 | Earth work for well excavation-Soil lift from 5.00 m. to 5.50 m. | 14.13 | 100.9 | 1425.717 |
25 | Earth work for well excavation-Soil lift from 6.00 m. to 6.50 m. | 14.13 | 130.7 | 1846.791 |
26 | Earth work for well excavation-Soil lift from 6.50 m. to 7.00 m. | 14.13 | 137.1 | 1937.223 |
27 | Earth work for well excavation-Soil lift from 7.00 m. to 7.50 m. | 14.13 | 143.5 | 2027.655 |
28 | Earth work for well excavation-soil lift from 7.50 m. to 8.00 m. | 14.13 | 149.9 | 2118.087 |
29 | Earth work for well excavation-Soil lift from 8.00 m. to 8.50 m. | 14.13 | 288.2 | 4072.266 |
30 | Earth work for well excavation-Soil lift from 8.50 m. to 9.00 m. | 14.13 | 297 | 4196.61 |
31 | Earth work for well excavation-Soil lift from 9.00 m. to 9.50 m. | 14.13 | 305.8 | 4320.954 |
32 | Earth work for well excavation-Soil lift from 9.50 m. to 10.00 m. | 14.13 | 314.6 | 4445.298 |