S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Excavating post holes (or similar holes) upto 0.5cum including getting out the excavated soil, than returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc., disposing of-Dense or hard soil | 88 | 88.3 | 7770.4 |
2 | Dag-beling-Single spade stroke minimum 75mm deep | 447.7 | 0.4 | 179.08 |
3 | Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-40 mm thick. | 47.15 | 419.8 | 19793.57 |
4 | Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-50 mm thick. | 50.35 | 419.8 | 21136.93 |
5 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 72 | 82.7 | 5954.4 |
6 | Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting. | 239.694 | 401.2 | 96165.2328 |