State: MADHYA PRADESH District: REWA Block: SIRMOUR Panchayat: BHATI GAWAN
Work Code: 1713/RC/22012034610291 (Periodic maintenance of CMGSY Road Bhatigawan to Bharuhia)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : ZP
Execution Agency : Rural Engineering Services(04004) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 15/9/2021 Work start date : 15/3/2022
Present status : Gravel Road Proposed Status : Repair & maint of Gravel Road Roads for Comm
Tech Sanction Details
Technical Sanction No. : 1713/11 Sanction Date : 13/1/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost CMGSY scheme2 scheme3 Total
758000 329000 0 0 746000 0 0 1075000 0 1833000
Financial Sanction Details
Financial\Administrative Sanction No: 1341/1713 Financial\Administrative Sanction Date 2/3/2022
Fin. Sanc. Amt. (in Rs) NREGA:1087000 CMGSY
746000
Scheme 2
0
Scheme 3
0
Total
1833000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Ordinary shrub jungle (areas below 25% covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting (for survey works)12500.981225
2Work charge15200052000
3Surface dressing of ground, including removing vegetation, and/ or unequalities not exceeding 15cm deep and disposal of rubbish lead upto 50m And lift upto1.5m-Dense or hard soil61809.3257597.6
4Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.2600210.63547638
5Transportation rates for Hume pipes (NP-2) 250 mm to 300 mm dia.4039.861594.4
6Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN136062.7285299.2
7Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia40435.4717418.8
8Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact125024.0630075
9Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to A or B or C of Table 2.1of IRC:SP:77-2008 having CBR not less500958479000
10Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 With Reinforced cement concrete (i) 5th Kilometre Stone (precast) (ii) Ordinary Kilometer Stone (Precast) (iii) 200 m stone (precast)41617.66470.4
11Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 With Reinforced cement concrete ) With Local Stone (i) 5th Kilometre Stone (ii) Ordinary Kilometer Stone (iii) 200 m stone16491.837869.28
12SIGN BOARD93313.5529821.95
13Collection/Excavation of Gravel Material meeting the requirements of Hard moorum as detailed in RES SOR chapter No. 03 Notes Clause 3.2(C) including stacking and all leads and lifts up to the loading point at quarry.1250211.55264437.5
14Collection of river Borne material (RBM)(any mixture of sand & gravel)i/c boxing and all leads and lifts up to the loading point at quarry.1360185.38252116.8
Total Activity 1833000
S.NoMaterialQuantityUnit PriceTotal
1hard shoulder transportion1250153.24191550
2Semi Reflective Sign Board32911.868735.58
3sign semi providing C 800mm x 600 mm rectangular43387.413549.6
4Transportation of GSB750153.24114930
5अन्‍य कर्य1746000746000
Total Material 1075000