S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 5162.5 | 1.8 | 9292.5 |
2 | Construction of Black Board surface on wall in C.M. 1:3 (Projecting 6 mmm. out of plastered surface of walls including painting with black board paint and finishing to the true shape and size with 40 mm wide alround boarder of cement mortar 1:3 | 5000 | 1 | 5000 |
3 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 2625 | 15 | 39375 |
4 | Lossening of hard soil by ploughing the existing gound | 7743.75 | 2.7 | 20908.125 |
5 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 7743.75 | 50 | 387187.5 |
6 | Supply of Mulching Sheet 40 micron, 1.2 m width | 20554 | 1 | 20554 |