S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Setting out work Refferance pillers, refferancing bench mark and temporary bench mark Construction of Reference Bench Mark 50x50x70 cm. made of 1:3:6 cement concrete i/c excavation of 50x50x50 cm pit, working benchmark 30x30x45 cm at every 500 m interva | 1000 | 7.46 | 7460 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 3000 | 1.8 | 5400 |
3 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil | 20.33 | 127.7 | 2596.141 |
4 | Levelling - Headwork.-Above 15 m interval | 1 | 508.8 | 508.8 |
5 | Transportation of metal | 196.61 | 63.54 | 12492.5994 |
6 | Transportation of metal | 780 | 70.65 | 55107 |
7 | Loading of metal in truck, dumper etc. | 876 | 28.62 | 25071.12 |
8 | Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1000 mm dia. | 6 | 3853.2 | 23119.2 |
9 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 1169.25 | 18.4 | 21514.2 |
10 | Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact | 959 | 24.7 | 23687.3 |
11 | Construction of hard shoulder as per clause 407 of specifications for rural roads (MORD), with soil having CBR value not less than 12, inclusive of all leads and lifts, providing 4-5% camber by tractor mounted grader or labourers, watering at OMC and comp | 110 | 370.2 | 40722 |
12 | Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to Table 2.2 of IRC:SP:77-2008, having Liquid Limit less than 25 and Plasticity inde | 52 | 508.6 | 26447.2 |
13 | Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau | 180 | 576.9 | 103842 |
14 | SIGN BOARD | 1 | 500 | 500 |
15 | Lossening of hard soil by ploughing the existing gound | 3912.06 | 2.7 | 10562.562 |
16 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 2931 | 50 | 146550 |
17 | Field Technical Supervisior Charge-FTSC | 1 | 22200 | 22200 |