State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: POLAYKHURDA
Work Code: 1719006071/RC/22012034340456 (Sudur sadak sampark chandni chok se shantidham polaykhurd )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Beneficiary(1719/Hitgrahi) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2017 Work start date : 3/6/2017
Present status : No Road Proposed Status : Construction of Gravel Road Roads for Community
Tech Sanction Details
Technical Sanction No. : 71/01/2017 Sanction Date : 3/5/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
232600 294700 0 0 0 0 0 295000 0 527300
Financial Sanction Details
Financial\Administrative Sanction No: 71/01/17 Financial\Administrative Sanction Date 4/5/2017
Fin. Sanc. Amt. (in Rs) NREGA:527300 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
528000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Setting out work Refferance pillers, refferancing bench mark and temporary bench mark Construction of Reference Bench Mark 50x50x70 cm. made of 1:3:6 cement concrete i/c excavation of 50x50x50 cm pit, working benchmark 30x30x45 cm at every 500 m interva10007.467460
2Site clearance, cutting grass, raking into heaps and removing off the premises30001.85400
3Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil20.33127.72596.141
4Levelling - Headwork.-Above 15 m interval1508.8508.8
5Transportation of metal 196.6163.5412492.5994
6Transportation of metal 78070.6555107
7Loading of metal in truck, dumper etc.87628.6225071.12
8Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1000 mm dia.63853.223119.2
9Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making1169.2518.421514.2
10Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact95924.723687.3
11Construction of hard shoulder as per clause 407 of specifications for rural roads (MORD), with soil having CBR value not less than 12, inclusive of all leads and lifts, providing 4-5% camber by tractor mounted grader or labourers, watering at OMC and comp110370.240722
12Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to Table 2.2 of IRC:SP:77-2008, having Liquid Limit less than 25 and Plasticity inde52508.626447.2
13Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau180576.9103842
14SIGN BOARD1500500
15Lossening of hard soil by ploughing the existing gound3912.062.710562.562
16Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed293150146550
17Field Technical Supervisior Charge-FTSC12220022200
Total Activity 528000
S.NoMaterialQuantityUnit PriceTotal
1Board122002200
2Compaction of Earth Work910.0863.5457826.4832
3Compaction of GSB52569.436435
4Compaction of Selected soil96024.723712
5contigency11500015000
6FTSC-Field Technical supervisi162006200
7hume pipe63853.223119.2
8Loosening Machine Rent3912.062.710562.562
9Transportanion of Soft Muram117070.6582660.5
10Transportation of GSB184161.3629690.24
11Transportation Of Material52134.046970.08
Total Material 295000