S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | (a) C.C. 1:2:4 (1cement, 2sand, 4metal) | 48 | 3855.96583333333 | 185086.36 |
2 | Providing stone chips under stone pitching | 75 | 457.812666666667 | 34335.95 |
3 | (a) Consolidation of Moorum /earth work (rate for 1Cum. of Moorum /earth work) | 3655 | 2.52450068399453 | 9227.05 |
4 | (IV) 2.0 Km. Lead | 41.25 | 145.433696969697 | 5999.14 |
5 | (IV) 2.0 Km. Lead | 3859.75 | 113.817674719865 | 439307.77 |
6 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making 4% camber and required Grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 97% as per table 300.1 and 300.2 of (MORD) - i/c required leads and lifts of materials etc. complete. | 3655 | 17.4425444596443 | 63752.5 |
7 | (a) Boulders | 36 | 598.843611111111 | 21558.37 |
8 | For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc. | 267.75 | 452.889785247432 | 121261.24 |
9 | (c) Hard moorum for Tank Work, lift of up to 3m depth | 220.5 | 169.830022675737 | 37447.52 |
10 | Benching the seat of embankment to an average depth of 15cm and cross slope of 1 in 12 including cleaning of all foreign material, vegetation and other growth like grass and plant roots and removing the rubbish up to a suitable distance and dressing etc. complete. | 315 | 172.89 | 54460.35 |
11 | Site clearance, cutting grass, raking into heaps and removing off the premises | 3500 | 2.81891428571429 | 9866.2 |
12 | a (iii) Loose or soft soil for Tank Work | 3592 | 106.730760022272 | 383376.89 |
13 | c (iii) Hard moorum for Tank Work | 172.8 | 191.907928240741 | 33161.69 |
14 | (a) Dense or hard soil | 45 | 154.448444444444 | 6950.18 |
15 | 22cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum | 187.5 | 379.205386666667 | 71101.01 |
16 | Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works ) | 3 | 3682.00333333333 | 11046.01 |