Work Code: 2609004093/RS/80433 (Soak pit in Govt. Elementary school at Salempur jattan)
Work Category: Rural Sanitation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 15/7/2020 Work start date : 2/9/2020
Present status : Not Exist Proposed Status : Construction of Soak Pit for Community
Tech Sanction Details
Technical Sanction No. : 2609004/2020-2021/24894/TS Sanction Date : 17/8/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
2173.21 18434.61 148.83 235.39 0 0 0 18900 0 20992.04
Financial Sanction Details
Financial\Administrative Sanction No: 2609004/2020-2021/24894/AS Financial\Administrative Sanction Date 24/8/2020
Fin. Sanc. Amt. (in Rs) NREGA:20992 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
21000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Cement Concrete 1:8:16 with brick ballast 40mm gauge.0.092356.11111111111212.05
2Cement concrete 1:2:4 with stone ballast or shingle0.034278.33333333333128.35
3Supplying & Laying dry brick bats.6.94950.9855907780986599.84
4First class burnt brick laid in cement sand mortar 1:5 in foundation and plinth0.693849.304347826092656.02
5Conglomerate floor 50mm thick cement concrete topping 1:2:4.( using mechancial mixer for mixing of material)0.88215.5189.64
612.5 mm thick cement plaster 1:4.1.61136.975155279503220.53
7Providing, Laying , fixing & jointing of P.V.C. Pipes as per ISI-4985 (ISI marked with the prior approval of Engineer-in-Charge) along the Trenches and laying the same in Trenches to correct alignment and gradients, cutting, jointing and testing complete as per specifications. (iii) 90mm o/d pipe of 10 Kgf. / sqcm9.14266.4770240700222435.6
8Earth work excavation in tank/digging work (Tank, Bandh, Pond/New Nalah, New Water Channel and construction of Retaining structure work).(1.1)Earth work excavation in Pond (Dugout, Pond, Mini Percolation Tank, compost Pit etc.) Ring Bandh (percolation Embankment, Earthen Gully plug, Water Harvesting Structure, Silt Distention Dam etc.)/pond/New Nalha/New Channal etc. Retuning wall-( wet or dry soil), laying 15 cm. layer-breaking of clods and emoving of Kankar and grass roots, dressing of earth work including compaction {with durmut) complete in all respect. (a) Ordinary Soil (i) 1.5 meter vertical lift and 15 meter horizontal lead7.56150.7817460317461139.91
9Earth work excavation in tank/digging work (Tank, Bandh, Pond/New Nalah, New Water Channel and construction of Retaining structure work).(1.1)Earth work excavation in Pond (Dugout, Pond, Mini Percolation Tank, compost Pit etc.) Ring Bandh (percolation Embankment, Earthen Gully plug, Water Harvesting Structure, Silt Distention Dam etc.)/pond/New Nalha/New Channal etc. Retuning wall-( wet or dry soil), laying 15 cm. layer-breaking of clods and emoving of Kankar and grass roots, dressing of earth work including compaction {with durmut) complete in all respect. (a) Ordinary Soil. (xiii) 4.50 meter vertical lift and 15 meter horizontal lead.1.62191.413580246914310.09
Total Activity 13900
S.NoMaterialQuantityUnit PriceTotal
11-Sharpening charges126002600
23-Display Board145004500
3MR1606-cement1.8414350644.49
4MR1607-Course Sand0.01351077.0714.540445
5MR1609-Stone Ballast (Bajri)0.0621024.163.4942
6MR1611-Bricks 1st class Including Carriage of 5km, Loading & Unloading.328.9165.351759.7006
7MR1613-Fine Sand0.262662.85173.6667
8MR1614-Brick Ballast7.7227779.146017.064478
9MR1681-Semi Skilled Mazdoor Labour0.0302402.5512.15701
10MR1742-P.V.C pipes 90 mm o/d pipe of 10 Kgf. / sqcm9.597234.122246.84964
Total Material 18100