S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Cement Concrete 1:8:16 with brick
ballast 40mm gauge. | 0.03 | 1887.66666666667 | 56.63 |
2 | Cement concrete 1:2:4 with stone ballast or shingle | 0.01 | 4251 | 42.51 |
3 | Reinforced cement concrete M-20 with cement @375/kg per cum hand mixed but excluding steel reinforcement centring and shuttering in foundation and plinth | 0.15 | 3770.13333333333 | 565.52 |
4 | Supplying & Laying dry brick bats. | 2.11 | 945.090047393365 | 1994.14 |
5 | 115mm thick brick wall in cement sand mortar 1:4 without reinforcement in foundations and plinth | 0.63 | 457.857142857143 | 288.45 |
6 | 12.5 mm thick cement plaster 1:4. | 0.65 | 122.6 | 79.69 |
7 | Cold twisted deformed (Ribbed/ Tor Steel Bar)
Bars Fe 500 grade as per IS 1786-1985, for R.C.C works, where not including in the completerate of RCC including bending and placing in position complete | 0.14 | 5458.14285714286 | 764.14 |
8 | Providing, Laying , fixing & jointing of P.V.C. Pipes as per ISI-4985 (ISI marked with the prior approval of Engineer-in-Charge) along the Trenches and laying the same in Trenches to correct alignment and gradients, cutting, jointing and testing complete as per specifications. (ii) 75mm o/d pipe of 10 Kgf. / sqcm | 21 | 187.459047619048 | 3936.64 |
9 | Earth work excavation in tank/digging work (Tank, Bandh, Pond/New Nalah, New Water Channel and construction of Retaining structure work).(1.1)Earth work excavation in Pond (Dugout, Pond, Mini Percolation Tank, compost Pit etc.) Ring Bandh (percolation Embankment, Earthen Gully plug, Water Harvesting Structure, Silt Distention Dam etc.)/pond/New Nalha/New Channal etc. Retuning wall-( wet or dry soil), laying 15 cm. layer-breaking of clods and emoving of Kankar and grass roots, dressing of earth work including compaction {with durmut) complete in all respect. (a) Ordinary Soil. (xiii) 4.50 meter vertical lift and 15 meter horizontal lead. | 3.09 | 175.346278317152 | 541.82 |