State: MADHYA PRADESH District: DAMOH Block: JABERA Panchayat: GUDA
Work Code: 1711006047/WH/22012034938886 (talab jidoddhar karya/kopakheda/jaruwa/guda)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 1/5/2023 Work start date : 10/2/2024
Present status : Silted Proposed Status : Renovation of Fisheries Ponds for Community
Tech Sanction Details
Technical Sanction No. : ts-251/47 Sanction Date : 11/5/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Public Contribution scheme2 scheme3 Total
711000 250000 0 0 0 0 0 250000 0 961000
Financial Sanction Details
Financial\Administrative Sanction No: as8717/47 Financial\Administrative Sanction Date 5/2/2024
Fin. Sanc. Amt. (in Rs) NREGA:961000 Public Contribution
0
Scheme 2
0
Scheme 3
0
Total
961000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Work charge1001000100000
3Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil40.41148.335994.0153
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)88.983162.88281433.0624
5Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used1.73829.126509.504
6Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Lime mortar 1:3 (1lime putty, 3sand)19.043083.558709.84
7Extra rate for C.R./ R.R./ U.C.R. stone masonry in super structure above plinth level upto floor two level.40.642865.65116460.016
8TRANSPORTATION OF MATERIAL3851000385000
9Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing39.6112.534456.188
Total Activity 961000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL512006000
240 M.M. Gitti58004000
3BOULDER CHECK15045067500
4Cement253508750
5Display board120002000
6Sand315004500
7Transportation charges1157200157200
Total Material 250000