Work Code: 1703004076/RC/22012034180947 (खरंजा निर्माण गोपी जाटव के मकान से इन्‍दर सिंह के )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/4/2013 Work start date : 5/9/2013
Present status : No Road Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 76/133 Sanction Date : 10/6/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
299640 199602 0 0 0 0 0 200000 0 499242
Financial Sanction Details
Financial\Administrative Sanction No: 76/12 Financial\Administrative Sanction Date 12/6/2013
Fin. Sanc. Amt. (in Rs) NREGA:499242 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
500000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Single spade stroke minimum 75mm deep6760.2135.2
2Dag-beling-Double spade "v" shaped stroke 100mm deep000
3Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.1216.8215.7262463.76
4Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock.182.52507.6192648.9772
5Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.257.185151.9639081.8326
6Loading of metal in truck, dumper etc.257.1926.286758.9532
7Unloading of metal in truck, dumper etc.257.1913.143379.4766
8Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN257.1969.717926.143
9Collection of hard moorum including stacking at quarry.257.19130.833640.452
10Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.135212.817305.6
11contingency125901.6125901.61
Total Activity 500000
S.NoMaterialQuantityUnit PriceTotal
1contangency13498.523498.52
2Contengency and sign board150005000
3Convergence Amount000
4Mate501467300
5PhotoCopy & Stationary1001100
6R.R.Stone other than Granite B123.2421.8551971.92
7Transportation of Boulder182.52507.6192648.9772
8मुरम परिवहन (1)257.19151.9639082.5924