S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Dag-beling-Single spade stroke minimum 75mm deep | 676 | 0.2 | 135.2 |
2 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 0 | 0 | 0 |
3 | Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar. | 1216.8 | 215.7 | 262463.76 |
4 | Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock. | 182.52 | 507.61 | 92648.9772 |
5 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 257.185 | 151.96 | 39081.8326 |
6 | Loading of metal in truck, dumper etc. | 257.19 | 26.28 | 6758.9532 |
7 | Unloading of metal in truck, dumper etc. | 257.19 | 13.14 | 3379.4766 |
8 | Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN | 257.19 | 69.7 | 17926.143 |
9 | Collection of hard moorum including stacking at quarry. | 257.19 | 130.8 | 33640.452 |
10 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil. | 1352 | 12.8 | 17305.6 |
11 | contingency | 1 | 25901.61 | 25901.61 |