Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 06:44:58 PM 
Back  
State: MADHYA PRADESH District: REWA Block: SIRMOUR Panchayat: JIWAR
Work Code: 1713003015/IF/9993667470 (Pashu shed Yadvendra Singh TS 2422)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 26/1/2014 Work start date : 15/6/2015
Present status : Not Exist Proposed Status : Cattle Shed
Tech Sanction Details
Technical Sanction No. : 2422 Sanction Date : 1/3/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
9500 43500 0 0 0 0 0 43500 0 53000
Financial Sanction Details
Financial\Administrative Sanction No: 23/5 Financial\Administrative Sanction Date 5/3/2014
Fin. Sanc. Amt. (in Rs) NREGA:53000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
53000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard115001500
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)3.1393007.59440.5425
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)5.0522343.811840.8776
4Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used3.139226.8711.9252
5Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:4 (1cement, 4sand)5.62324.413016.64
615mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand)16.1285.81383.096
7Transportation of 20 MM metal2.67288.4770.028
8Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.5.76259.561495.0656
9Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.5.66288.41632.344
10Providing and fixing C.P. brass waste for wash basin or sink .-32 mm dia2.36288.4680.624
11Providing and fixing on Wall face Asbestos Cement building pipe of the following nominal size including jointing with sun yarn soaked in bitumen and cement mortar 1:2 (1cement, 2sand) complete .-100 mm dia.3.590.6317.1
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work16.581.21339.8
13Collection of hard moorum including stacking at quarry.5.76130.8753.408
14CPT excavation111881188
15transportion of sand7259.561816.92
16contingency147004700
17TRANSPOTATION OF CEMENT1.3259.56337.428
Total Activity 53000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. B.T. METAL1.2011558.41871.6384
240 M.M. METAL (cum)7.5881268.49624.6192
3BRICK8.4150012600
4CEMENT (Beg)4830014400
5MURROM2.54139.86355.2444
6SAND5.549837.564647.62044
Total Material 43500