S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 390 | 7.02397435897436 | 2739.35 |
2 | Providing stone chips under stone pitching | 164 | 457.812743902439 | 75081.29 |
3 | (a) Other then black trap Basalt or granite | 166 | 313.72921686747 | 52079.05 |
4 | (a) Consolidation of Moorum /earth work (rate for 1Cum. of Moorum /earth work) | 985.05 | 2.52450129435054 | 2486.76 |
5 | (III) 1.5 Km. Lead | 400.05 | 106.655468066492 | 42667.52 |
6 | (VIII) 4.0 Km. Lead | 585 | 142.001863247863 | 83071.09 |
7 | For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc. | 85.05 | 452.889829512052 | 38518.28 |
8 | Hearting, casing/cut off filling soil etc.
At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete. | 985.05 | 21.9341657783869 | 21606.25 |
9 | b (iii) Dense or hard soil for Tank Work | 338.625 | 144.075009228498 | 48787.4 |
10 | c (iii) Hard moorum for Tank Work | 606.6 | 191.90789647214 | 116411.33 |
11 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 23.625 | 609.846349206349 | 14407.62 |