S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2500 | 2500 |
2 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 258 | 0.4 | 103.2 |
3 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 115.15 | 73.2 | 8428.98 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 60.11 | 2503.8 | 150503.418 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 17.2 | 1885.5 | 32430.6 |
6 | False work for R.C.C. and P.C.C. work in plinth and foundation | 188 | 112.3 | 21112.4 |
7 | Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide) | 161 | 5.9 | 949.9 |
8 | Transportation of metal | 80.23 | 130.5 | 10470.015 |
9 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 80.23 | 34 | 2727.82 |
10 | Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN | 39.47 | 22.7 | 895.969 |
11 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 115.15 | 67.8 | 7807.17 |
12 | Collection of hard moorum including stacking at quarry. | 80.23 | 109.3 | 8769.139 |
13 | contingency | 1 | 10000 | 10000 |