S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 811.68 | 1 | 811.68 |
2 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 136 | 5 | 680 |
3 | Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting) | 426.2 | 7.5 | 3196.5 |
4 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 1037 | 2.5 | 2592.5 |
5 | Transportation of metal | 7869 | 1 | 7869 |
6 | FOR EARTHEN DAM - Providing fitter blanket, horizontally, including laying, Spreading, packing etc. in layers of required thickness but excluding excavation of foundation.-Metal 80 mm nominal size | 785.7 | 2.5 | 1964.25 |
7 | FOR EARTHEN DAM - Providing fitter blanket, horizontally, including laying, Spreading, packing etc. in layers of required thickness but excluding excavation of foundation.-Metal 40 mm nominal size | 952.4 | 2.5 | 2381 |
8 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 895.1 | 5 | 4475.5 |