S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 200 | 6.65 | 1330 |
2 | 20mm cement concrete toping (1 cement, 2-3 stone aggregate 4.75mm and below by volume) laid over and finished monolithic with base concrete. | 655 | 21.79 | 14272.45 |
3 | Lossening of hard soil by ploughing the existing gound | 655 | 74.83 | 49013.65 |
4 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 655 | 3.6 | 2358 |
5 | contingency | 1 | 14000 | 14000 |