S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 558 | 7.60931899641577 | 4246 |
2 | (III) Lead upto 200 meters | 995.48 | 126.36338248885 | 125792.22 |
3 | (I) 1.50 m. to 3.00 m. | 837 | 11.357192353644 | 9505.97 |
4 | (II) 3.00 m to 4.50 m | 155 | 19.89 | 3082.95 |
5 | Hearting, casing/cut off filling soil etc.
At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete. | 2488.7 | 23.1489693414232 | 57610.84 |
6 | Benching the seat of embankment to an average depth of 15cm and cross slope of 1 in 12 including cleaning of all foreign material, vegetation and other growth like grass and plant roots and removing the rubbish up to a suitable distance and dressing etc. complete. | 167.4 | 187.297491039427 | 31353.6 |
7 | b (iii) Dense or hard soil for Tank Work | 2488.7 | 156.081251255676 | 388439.41 |