S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 8000 | 8000 |
2 | Transportation of metal | 1000 | 92.16 | 92160 |
3 | Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact | 2500 | 24.7 | 61750 |
4 | Lossening of hard soil by ploughing the existing gound | 3000 | 2.7 | 8100 |
5 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 3000 | 50 | 150000 |
6 | Setting out work (Reference pillars referencing bench mark and temporary bench mark):Painting/Marking of Reference/Working Bench Mark over existing permanent structure Fixing of Reference pegs made of local rough wood for making centre line and toe lines. Fixing of reference poles made of bamboos or jungle wood bellies etc. | 1 | 33000 | 33000 |