S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 312 | 6.65 | 2074.8 |
2 | Dag-beling-Single spade stroke minimum 75mm deep | 200 | 0.38 | 76 |
3 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 39 | 1374.65 | 53611.35 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 20.8 | 3920.69 | 81550.352 |
5 | False work for R.C.C. and P.C.C. work in plinth and foundation | 52 | 172.01 | 8944.52 |
6 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand) | 218.4 | 2699.5 | 589570.8 |
7 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing | 130 | 109.18 | 14193.4 |
8 | Stacking without boxing.-Masonry stones, pitching stones or boulders | 218.4 | 44.16 | 9644.544 |
9 | Transportation of metal | 57.304 | 234.04 | 13411.42816 |
10 | Transportation rates for Masonry stone. | 218.4 | 352.15 | 76909.56 |
11 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 108.144 | 226.38 | 24481.63872 |
12 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 540.8 | 148.33 | 80216.864 |