Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 06:28:58 PM 
Back  
State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: GADHOLAKHANDE
Work Code: 1711003048/WC/22012035088874 (STOP DAM NIRMAN KARY MUKTI DHAM KE PEECHE CHAKRA NALA PAR )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2023 Work start date : 27/5/2023
Present status : Non-existent Proposed Status : Constr of Earthen Check Dam for Community
Tech Sanction Details
Technical Sanction No. : 400/ts Sanction Date : 25/5/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Public Contribution scheme2 scheme3 Total
921000 1552000 0 0 0 0 0 1552000 0 2473000
Financial Sanction Details
Financial\Administrative Sanction No: 32/as Financial\Administrative Sanction Date 22/6/2023
Fin. Sanc. Amt. (in Rs) NREGA:2473000 Public Contribution
0
Scheme 2
0
Scheme 3
0
Total
2473000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard130483048
2Work charge178470.7278470.72
3Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting)65.1335.8621864.486
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)150.473467.98521826.9506
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)32.133077.9698894.8548
6Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used150.574408.24663748.6968
7Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height360102.736972
8Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars66087.1657525.6
9TRANSPORTATION OF MATERIAL92.822242208102.44
10Providing and filling in foundation trenches and at the back of abutments, wing walls etc. and below pipe bed in layers not exceeding 15cm thick including watering and compacting including all lead and lifts.-Selected granular material in filling.145.92647.4294471.5264
11Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti3585.59191.9688074.721
Total Activity 2473000
S.NoMaterialQuantityUnit PriceTotal
120 MM Gitti186.341400260876
240 MM. Gitti210.111100231121
3CEMENT.85.95511473394.9
4centring465.8154.1471798.412
5HIRE CHARGE OF MIXER MACHINE3088526550
6SAND.182.181600291488
7Treanportesion Charges35224278470
8लोहा1200.5596115252.8
9साईनबोर्ड 130483048
Total Material 1552000