Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 05:03:05 AM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: NAHAR MAL
Work Code: 1725007049/RC/22012034185354 (पंच परमेश्‍वर सी सी रोड निर्माण कार्य हरीलाल के घर)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/6/2013 Work start date : 15/6/2013
Present status : Cement concrete Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 211...... Sanction Date : 1/7/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
128000 84000 0 0 400000 0 0 484000 0 612000
Financial Sanction Details
Financial\Administrative Sanction No: 12...... Financial\Administrative Sanction Date 11/9/2013
Fin. Sanc. Amt. (in Rs) NREGA:212000 Panchparmeshwar
400000
Scheme 2
0
Scheme 3
0
Total
612000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil157.0881.212754.896
2Dag-beling-Double spade "v" shaped stroke 100mm deep2200.5110
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)136.883177.8434977.264
4Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used136.88118.616233.968
5False work for R.C.C. and P.C.C. work in plinth and foundation198154.230531.6
6Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)2206.31386
7Collection of approved soil having CBR not less then 12, including stacking at quarry.141.4105.314889.42
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 141.377.51060.275
9Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 141.3700
10Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 134.2405368
11Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms.346.69165.4257349.4598
12Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7141.3723.63336.332
13work charge13400034000
Total Activity 612000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL116.35950110532.5
2CEMENT(BEGS)874300262200
3Centering and Shuttering194007600
4Display board110001000
5Drinking Water Facilities105005000
6Generator154006000
7Hire Charges of Concrete mixer18100018000
8mason perday183005400
9murrom141.3710014137
10photocopy1522304
11Photograph425100
12Plastic220459900
13SAND58.8650029430
14TESTING CHARG122472247
15Thermocoal50251250
16Transportation charges115005500
17Vibrator (Per Day)183005400
Total Material 484000