Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:23:00 PM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: GOARKALAN
Work Code: 1702001025/WC/22012034993310 (Bund Nirman Karya Kaliyan Ke Khet Ke Pass, Janjaripura, Goarkala)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 16/8/2022 Work start date : 29/8/2022
Present status : Non-existent Proposed Status : Constr of Earthen contour Bund for Community
Tech Sanction Details
Technical Sanction No. : 1702001/2022-2023/155515/TS Sanction Date : 16/9/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
564433.49 286903.27 39785.84 13957.42 0 0 0 341000 0 905080.02
Financial Sanction Details
Financial\Administrative Sanction No: 1702001/2022-2023/155515/AS Financial\Administrative Sanction Date 17/9/2022
Fin. Sanc. Amt. (in Rs) NREGA:905075 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
906000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(I) Lead upto 100 Metres115038.888721739130444722.03
2(I) 1.50 m. to 3.00 m.460010.483560869565248224.38
3(c) C.C. 1:4:8 (1cement, 4sand, 8metal)62862.1433333333317172.86
4(e) In Cement mortar 1:6 (1cement, 6sand)362899.03194444444104365.15
5(XXX) 60 Km. Lead92.4911.09837662337784185.49
6Benching the seat of embankment to an average depth of 15cm and cross slope of 1 in 12 including cleaning of all foreign material, vegetation and other growth like grass and plant roots and removing the rubbish up to a suitable distance and dressing etc. complete.292.5172.89001709401750570.33
7Site clearance, cutting grass, raking into heaps and removing off the premises30002.818913333333338456.74
8(b) Dense or hard soil30156.7873333333334703.62
922cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum420379.205404761905159266.27
10Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine.46003.6001804347826116560.83
11Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed.460079.0971760869565363847.01
Total Activity 903000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper1.5368851359.36
20084-Hire charges of Diesel truck - 9 tonne (without POL)14.89849485224233402.4254537
30367-Portland Cement4.3662551124062.1282
40982-Coarse sand (zone III)4.42741028.164552.075584
50983-Fine sand (zone IV)12.71161076.2513680.8595
61157-Stone for masonry work41.76519.7521704.76
71158-Stone for pitching 15 cm x 22.5 cm12631539690
81235-Diesel oil405.654343326827584.49534576
93-Display Board / CIB130003000
105001-Mobil oil14.52499725182.92656.621997025
11MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT6.1235253214.575
12MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)2.26086821541.8656
13MR6089-Hire Charges for tractor with ploughing arrangement including running expanses and driver20.770814655.6
Total Material 192000