S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | (I) Lead upto 100 Metres | 1150 | 38.8887217391304 | 44722.03 |
2 | (I) 1.50 m. to 3.00 m. | 4600 | 10.4835608695652 | 48224.38 |
3 | (c) C.C. 1:4:8 (1cement, 4sand, 8metal) | 6 | 2862.14333333333 | 17172.86 |
4 | (e) In Cement mortar 1:6 (1cement, 6sand) | 36 | 2899.03194444444 | 104365.15 |
5 | (XXX) 60 Km. Lead | 92.4 | 911.098376623377 | 84185.49 |
6 | Benching the seat of embankment to an average depth of 15cm and cross slope of 1 in 12 including cleaning of all foreign material, vegetation and other growth like grass and plant roots and removing the rubbish up to a suitable distance and dressing etc. complete. | 292.5 | 172.890017094017 | 50570.33 |
7 | Site clearance, cutting grass, raking into heaps and removing off the premises | 3000 | 2.81891333333333 | 8456.74 |
8 | (b) Dense or hard soil | 30 | 156.787333333333 | 4703.62 |
9 | 22cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum | 420 | 379.205404761905 | 159266.27 |
10 | Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine. | 4600 | 3.60018043478261 | 16560.83 |
11 | Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed. | 4600 | 79.0971760869565 | 363847.01 |