Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Jun-2024 06:05:16 PM 
Back  
State: MADHYA PRADESH District: REWA Block: MAUGANJ Panchayat: DAGADAUAA NO.2
Work Code: 1713006063/RC/22012034202032 (खेत सडक गुढसीतापुर मार्ग से चदुआदुआरी बस्‍ती तक डग)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 1/1/2014 Work start date : 22/1/2014
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 271/63 Sanction Date : 8/1/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
726766 484511 0 0 285273 0 0 770000 0 1496550
Financial Sanction Details
Financial\Administrative Sanction No: 01/63 Financial\Administrative Sanction Date 9/1/2014
Fin. Sanc. Amt. (in Rs) NREGA:1211277 Panchparmeshwar
285273
Scheme 2
0
Scheme 3
0
Total
1497000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard115001500
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.64801.610368
3Filling foundation and around masonry work with moorum I/c ramming layers and watering.17.32145.42518.328
4Labour only for item no.040254035.819332
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.532343.83586.014
6Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)0.113400.4374.044
7Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand)5.4185510017
8Pointing on CR masonry with cement mortar 1:4(1cement, 4sand)-Flush pointing10.1359597.67
9Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 4723.1113.563761.985
10Transportation of metal 2967.3102.69304712.037
11Transportation of metal 1530.9139.86214111.674
12Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.567295.56167582.52
13Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN56732.818597.6
14Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-450mm dia22.5574.2512920.625
15Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.7.5347626070
16Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making3115.6721.566986.905
17Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor1530.92335210.7
18Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work4723.1181.2383516.532
19Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil11.9388.31053.419
20Collection of hard moorum including stacking at quarry.567130.874163.6
21Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 With Reinforced cement concrete (i) 5th Kilometre Stone (precast) (ii) Ordinary Kilometer Stone (Precast) (iii) 200 m stone (precast)43251300
22Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 With Reinforced cement concrete ) With Local Stone (i) 5th Kilometre Stone (ii) Ordinary Kilometer Stone (iii) 200 m stone45502200
23work charge18714627302
24contingency10485548550
Total Activity 1497000
S.NoMaterialQuantityUnit PriceTotal
1Convergence Amount1028527.3285273
2Transportanion of hard Muram425.25295.56125686.89
3Transportation of embankment s741.82102.6976177.4958
4Transportation of GSB141.75223.5631689.63
5Transportation Of Selected Soi1530.9139.86214111.674
6Transportation of Water2704.5213.536511.02
Total Material 770000