State: MADHYA PRADESH District: REWA Block: SIRMOUR Panchayat: SADAHANA
Work Code: 1713003086/RS/22012034649495 (सार्वजनिक शौचालय निर्माण ग्राम कमरहट सदहना )
Work Category: Rural Sanitation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2021 Work start date : 25/3/2022
Present status : Not Exist Proposed Status : Construction of Multi Unit Toilets for School
Tech Sanction Details
Technical Sanction No. : 20/86/22 Sanction Date : 12/10/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost SBM scheme2 scheme3 Total
100000 0 0 0 300000 0 0 300000 0 400000
Financial Sanction Details
Financial\Administrative Sanction No: 1242/86/22 Financial\Administrative Sanction Date 22/1/2022
Fin. Sanc. Amt. (in Rs) NREGA:100000 SBM
300000
Scheme 2
0
Scheme 3
0
Total
400000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises30.53129.43950.582
2Work charge1000185185000
3Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Hard moorum11.55151.11745.205
4Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m9.3476.7716.378
5Filling foundation and around masonry work with moorum I/c ramming layers and watering.125223.7427967.5
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)4.122941.312118.156
7Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)3.545173.618314.544
8Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars277.7363.217552.536
915mm thick cement plaster on rough side of wall in-Cement mortar 1:3 (1cement, 3sand)93110.710295.1
10Chequered precast cement concrete tiles 22mm thick with aggregate of size upto 6mm in floors, treads of steps and landing on 20mm thick bed of cement mortar 1:6 (1cement, 6 sand) jointed with neat cement slurry with pigment to match the shade of the tiles-Medium shades using approximately 50% white cement and 50% ordinary cement.41.74568.923745.886
11White glazed tiles 6mm thick in flooring, treads of steps and landings laid on a bed of 12mm thick cement mortar 1:3 finished with flush pointing in white cement.92.5592685701.3
12Providing and fixing water closet squatting pan (Indian type W.G. pan) size 580mm (earth work bed concrete, foot rests and trap to be measured and paid for separately)-Vitreous China Orissa pattern- standard colour7973.76815.9
13Providing and fixing 100mm size P or S trap for water closet squatting pan including jointing the trap with pan and soil pipe in cement mortar 1:1 (1cement, 1fine sand)-Vitreous china7345.32417.1
14SIGN BOARD135003500
Total Activity 400000
S.NoMaterialQuantityUnit PriceTotal
1Convergence Amount1300000300000
Total Material 300000