S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | (a) C.C. 1:2:4 (1cement, 2sand, 4metal) | 0.2 | 3829.1 | 765.82 |
2 | (c) 50 mm thick | 9.92 | 355.328629032258 | 3524.86 |
3 | (j) Cement mortar 1:6 (1cement, 6sand) | 2.28 | 3911.27192982456 | 8917.7 |
4 | (d) Cement mortar 1:6 (1cement, 6sand) | 10.4 | 141.556730769231 | 1472.19 |
5 | Extra rate for finishing with a floating cot of neat cement slurry over cement plaster of any thickness. | 4.08 | 39.6176470588235 | 161.64 |
6 | (a) 40 mm thick. | 0.72 | 254.319444444444 | 183.11 |
7 | (XXXI) 70 Km. Lead | 9 | 715.081111111111 | 6435.73 |
8 | (XXVII) 40 Km. Lead | 13.5 | 562.562222222222 | 7594.59 |
9 | (XX) 20 Km. Lead | 4.5 | 289.368888888889 | 1302.16 |
10 | Providing and fixing on wall face unplasticised Rigid PVC Rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion.
(ii) 110 mm diameter (minimum wall thickness 2.2mm) | 20 | 232.2005 | 4644.01 |
11 | (b) Dense or hard soil | 28.6 | 148.333216783217 | 4242.33 |
12 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 13.5 | 163.567407407407 | 2208.16 |
13 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 4.5 | 228.122222222222 | 1026.55 |
14 | Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry. | 4.5 | 185.375555555556 | 834.19 |