S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 0 | 0 | 0 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 5.052 | 2343.8 | 11840.8776 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 0.219 | 2343.8 | 513.2922 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 2.92 | 3234.3 | 9444.156 |
5 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime Mortar 1: 2(1lime, 2sand) | 2.38 | 2334.4 | 5555.872 |
6 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime mortar 1:3 (1lime putty, 3sand) | 3.22 | 2334.4 | 7516.768 |
7 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:4 (1cement, 4sand) | 16.12 | 85.8 | 1383.096 |
8 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms. | 5.76 | 390.36 | 2248.4736 |
9 | Providing and fixing laboratory sink with C.I. or M.S. brackets painted white including cutting holes in walls and making good the same but excluding fitting.-Glazed Earthenware 450 mm x 300 mm x 150 mm size | 3.5 | 90.3 | 316.05 |
10 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 16.5 | 81.2 | 1339.8 |
11 | 1902 Transportion of metal | 27.92 | 208.4 | 5818.528 |