S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2500 | 2500 |
2 | Contingency | 1 | 8531 | 8531 |
3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 264.539 | 40 | 10581.56 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 0.89 | 2579.5 | 2295.755 |
5 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size) | 2.35 | 3612.4 | 8489.14 |
6 | False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift | 9.33 | 325.4 | 3035.982 |
7 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:3 (1cement, 3sand) | 5.37 | 3613 | 19401.81 |
8 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:4 (1cement, 4sand) | 12.96 | 3803.7 | 49295.952 |
9 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:5 (1cement, 5sand) | 13.99 | 3994.4 | 55881.656 |
10 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand) | 3.1 | 4375.8 | 13564.98 |
11 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:8 (1cement, 8sand) | 13.28 | 4185.1 | 55578.128 |
12 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 147.69 | 65.5 | 9673.695 |
13 | 20mm thick cement plaster in two coat on rough side of wall in-Cement mortar 1:3 (1cement, 3sand) | 181.34 | 202.7 | 36757.618 |
14 | Providing and fixing small pieces (not exceeding 150cucm) for making good where hinges etc have been removed from frames or joinery, etc.-Sal wood. | 0 | 0 | 0 |
15 | Earth work for well excavation-Lift from 6.50 m. to 7.00 m. | 11.87 | 520.6 | 6179.522 |
16 | Earth work for well excavation-Lift from 7.00 m. to 7.50 m. | 11.87 | 534.7 | 6346.889 |
17 | Earth work for well excavation-Hard moorum lift from 10.50 m. to 11.00 m. | 7.09 | 777.2 | 5510.348 |
18 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 5.50 m. to 6.00 m. | 11.87 | 492.4 | 5844.788 |
19 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 5.00 m. to 5.50 m. | 11.87 | 480.8 | 5707.096 |
20 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 7.50m. to 8.00 m. | 10.82 | 548.8 | 5938.016 |
21 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 8.50 m. to 9.00 m. | 10.82 | 577 | 6243.14 |
22 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 9.50 m. to 10.00 m. | 10.82 | 605.2 | 6548.264 |
23 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 11.00 m. to 11.50 m. | 7.09 | 795.2 | 5637.968 |
24 | Earth work for well excavation-Hard rock requiring blasting lift from 6.00 m. to 6.50 m. | 11.87 | 506.5 | 6012.155 |
25 | Earth work for well excavation-Hard rock requiring blasting lift from 8.00 m. to 8.50 m. | 10.82 | 562.9 | 6090.578 |
26 | Earth work for well excavation-Hard rock requiring blasting lift from 9.00 m. to 9.50 m. | 10.82 | 591.1 | 6395.702 |
27 | Earth work for well excavation-Hard rock requiring blasting lift from 10.00 m. to 10.50 m. | 7.09 | 759.2 | 5382.728 |
28 | Earth work for well excavation- Hard rock requiring blasting lift from 11.50 m. to 12.00 m | 7.09 | 813.2 | 5765.588 |
29 | Extra rates for quantities of work executed . in or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works) | 1 | 13785 | 13785 |
30 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work | 42.39 | 130.3 | 5523.417 |
31 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work | 14.13 | 138.1 | 1951.353 |
32 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Loose or soft soil for Tank Work | 14.13 | 145.9 | 2061.567 |
33 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 14.13 | 153.7 | 2171.781 |
34 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work | 12.98 | 173 | 2245.54 |
35 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed-Hard moorum for Road Work | 12.98 | 180.8 | 2346.784 |
36 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Well Work | 12.98 | 188.6 | 2448.028 |
37 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Tank Work | 12.98 | 196.4 | 2549.272 |
38 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Tank Work | 11.87 | 480.8 | 5707.096 |
39 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Dense or hard soil (PT/30/30) | 7.09 | 831.2 | 5893.208 |
40 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Tank Work | 6.28 | 849.2 | 5332.976 |
41 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Well Work | 6.28 | 867.2 | 5446.016 |
42 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum (CP/3/0.45) | 6.28 | 885.2 | 5559.056 |
43 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Dence or hard soil (PT/60/60) | 6.28 | 903.2 | 5672.096 |
44 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Dense or hard soil (PT/45/45) | 6.28 | 921.2 | 5785.136 |
45 | Supply of Pvc pipe line 63mmX4kg/cm2 | 5 | 108.1 | 540.5 |
46 | Field Technical Supervisior Charge-FTSC | 1 | 4265.66 | 4265.66 |