S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Cement Concrete 1:8:16 with brick
ballast 40mm gauge. | 12.75 | 2426.60392156863 | 30939.2 |
2 | First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth | 26.62 | 3658.62885048835 | 97392.7 |
3 | 60mm thick cement concrete interlocking paver block of M-35 grade machine made rubber moulded smooth finish by strong vibratory process or with vibro -hydraulic compaction machine and of approved size and design / shape laid in ordinary Gray Colour and pattern over and including 40mm thick Coarse Sand. | 122.98 | 606.925516344121 | 74639.7 |
4 | 12.5 mm thick cement plaster 1:4. | 137.54 | 141.028646212011 | 19397.08 |
5 | Wrought iron and mild steel ladders, framed grills, grating etc. with ends of bars, riveted or welded or forged, framed window guards, barred iron doors, stair case, iron railing including cost of
bolts and nuts or screws or welding rod, complete fixed in position. | 5 | 8355.41 | 41777.05 |
6 | Providing, Laying , fixing & jointing of P.V.C. Pipes as per ISI-4985 (ISI marked with the prior approval of Engineer-in-Charge) along the Trenches and laying the same in Trenches to correct alignment and gradients, cutting, jointing and testing complete as per specifications. (ii) 75mm o/d pipe of 10 Kgf. / sqcm | 10 | 187.669 | 1876.69 |
7 | Maintenance of lawn with fine grass mowing with the help of shrubs master for the 1st year including watering etc. | 415.26 | 55.9078167894813 | 23216.28 |
8 | Other Works.(4.1)Earth work in excavation in foundation of building/Nalah upto 1.5 meter depth, including dressing of bottom and sides of trenches/watering, stacking the excavated soil, clear from the edge of excavation and subsequent earth filling around masonry, in 15cm. layer with compaction including disposal of all surplus soil, as directed with in a lead of 50 meter.(a) Ordinary Soil (i) 1.5meter vertical lift and 15 meter horizontal lead. | 18.04 | 177.750554323725 | 3206.62 |
9 | Social Forestry. (8.16) Plantation of tree in dig pit, fixing the stick and refilling the soil. (ii) size 0.45x0.45x0.45 mtr. | 100 | 5.211 | 521.1 |
10 | Social Forestry.(8.18) (ii) watering the collective plants ( water is available within 30 mtr lead). | 4000 | 6.2754425 | 25101.77 |
11 | Social Forestry. 8.2 Digging holes for plantation size 0.45x0.45x0.45 mtr/O.30x0.30x0.30 mtr. including berm making around hole with excavated soil. (i) Ordinary Soil | 9.55 | 165.909947643979 | 1584.44 |