State: MADHYA PRADESH District: KATNI Block: DHIMERKHEDA Panchayat: ATRIYA
Work Code: 1744006066/AV/22012034368704 (आंगनबाड़ी भवन निर्माण कार्य)
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 14/4/2017 Work start date : 28/9/2017
Present status : NEW Proposed Status : AWC
Tech Sanction Details
Technical Sanction No. : 2793/066 Sanction Date : 13/12/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost ICDS Performance Grant scheme3 Total
108000 72000 0 0 200000 400000 0 672000 0 780000
Financial Sanction Details
Financial\Administrative Sanction No: 1413/066 Financial\Administrative Sanction Date 31/1/2017
Fin. Sanc. Amt. (in Rs) NREGA:180000 ICDS
200000
Performance Grant
400000
Scheme 3
0
Total
780000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Cement Mortar 1:8 ( 1 cement, 8 sand )000
2Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil23.33761773.08
3Filling foundation and around masonry work with moorum I/c ramming layers and watering.24.21156.33784.023
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)8.682633.622859.648
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)40.313661.3147587.003
6False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift161.96286.746433.932
7False work for R.C.C. and P.C.C. work in plinth and foundation51.71143.47415.214
8Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)42.662703.2115318.512
9Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height710.8567.848195.63
10Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars3164.3455.5175620.87
1115mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand)103.06317.232690.632
1220mm thick cement plaster in two coat on rough side of wall in-Cement mortar 1:6 (1cement, 6sand)48.98159.97831.902
13Chequered precast cement concrete tiles 22mm thick with aggregate of size upto 6mm in floors, treads of steps and landing on 20mm thick bed of cement mortar 1:6 (1cement, 6 sand) jointed with neat cement slurry with pigment to match the shade of the tiles-Dark shades using ordinary cement.419.990.8138131.119
14White glazed tiles 6mm thick in flooring, treads of steps and landings laid on a bed of 12mm thick cement mortar 1:3 finished with flush pointing in white cement.13705.89175.4
15Marble stone slab flooring over 20mm average thick base of C.M. 1:6 with grey cement including rubbing polishing etc. complete. (Area of each stone should not be less than 0.20 Sqm.)-Marble slab 25 mm thick.46.2285339425.66
16Snowcem or durocem painting of any shade-2 coats on new work214.7714.63135.642
17Painting with enamel paint, brushing, interior to give an even shade I/n cleaning the surface of all dirt dust and other foreign matter on steel and other metal surfaces.-2 coats20.3158.61190.166
18Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms.17900079000
Total Activity 780000
S.NoMaterialQuantityUnit PriceTotal
120 MM METAL36.28486.617653.848
240 mm Metal7.81344.42689.764
3Bricks206083.572128
4Cement(bori)419280117320
5cement(T)000
6Contengance charges11300013000
7electric fitting12500025000
8iron bar3164.3455.5175620.87
9M.S. Doors & Windows & other F710.8567.848195.63
10Marble Tiles46.2285339425.66
11Moorum(T)24.21164.253976.4925
12sand (t)33.61906.3130461.0791
13Sanitary Fitting11500015000
14Terrazo Tiles.13705.89175.4
15Transportation charges18700087000
16Water Saplay11500015000
Total Material 672000