S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 4516.5 | 3 | 13549.5 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 37.46 | 2562.5 | 95991.25 |
3 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 1915.23 | 165 | 316012.95 |
4 | Transportation of metal | 5483.16 | 172.4 | 945296.784 |
5 | Transportation of metal | 10181.1 | 183.16 | 1864770.276 |
6 | FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc. | 1092.39 | 474 | 517792.86 |
7 | FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders | 771.53 | 574.6 | 443321.138 |
8 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 2814.13 | 52.7 | 148304.651 |
9 | FTSC- Field supervision charges | 2276 | 100 | 227600 |