S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 400 | 1.8 | 720 |
3 | Contingency | 1 | 26116 | 26116 |
4 | Work charge | 1 | 8227 | 8227 |
5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 72 | 39 | 2808 |
6 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 80 | 60 | 4800 |
7 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 120 | 60 | 7200 |
8 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 9 | 3474.1 | 31266.9 |
9 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 80 | 1782 | 142560 |
10 | Extra rate for laying cement concrete in or under water or liquid mud including cost of pumping and bailing out and removing slush etc. complete. | 80 | 89.2 | 7136 |
11 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand) | 162 | 1537.3 | 249042.6 |
12 | TRANSPORTATION OF MATERIAL | 1 | 128258 | 128258 |
13 | Hammer dressed 26cm thick stone paving laid in camber with 20mm lime mortar (1:2) bedding and cement pointing in cement mortar 1:3 for roadways. | 800 | 697.5 | 558000 |
14 | Collection of approved soil having CBR not less than 5, including stacking at quarry. | 80 | 98.3 | 7864 |
15 | Collection of rubble masonry (size 0.014cum to 0.06cum) other then black trap, basalt or granite. | 162 | 509.4 | 82522.8 |
16 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 52.01 | 151.5 | 7879.515 |
17 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 560 | 96.2 | 53872 |
18 | Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading-3 (Size ranging from 53 mm to 22.4 mm) | 72 | 496.2 | 35726.4 |