State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: LALGAON
Work Code: 1713004009/RC/22012034324930 (सुदूर ग्राम संपर्क सडक जयभारत नगर से सेंदहवा प्‍लाट तरफ टीएस 1741)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2016 Work start date : 2/2/2017
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 4009/1741 Sanction Date : 29/1/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
691000 415000 0 0 0 0 0 415000 0 1106000
Financial Sanction Details
Financial\Administrative Sanction No: 1741/38 Financial\Administrative Sanction Date 2/2/2017
Fin. Sanc. Amt. (in Rs) NREGA:1106000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1106000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises88891.816000.2
2Dag-beling-Single spade stroke minimum 75mm deep50000.31500
3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m123352.764979.1
4Collection of approved soil having CBR not less than 5, including stacking at quarry.265752.7140023.9
5Collection of approved soil having CBR not less then 12, including stacking at quarry.41752.721975.9
6Transportation of metal 2962105311010
7Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-600mm dia5412120605
8Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making138921.630002.4
9Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor281423.165003.4
10Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)49940.120009.9
11Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau625576360000
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.2700014000
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.44504.518018
14Cautionary, mandator, informatory, direction and place indentification signs6308218492
15Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 With Reinforced cement concrete (i) 5th Kilometre Stone (precast) (ii) Ordinary Kilometer Stone (Precast) (iii) 200 m stone (precast)104024020
Total Activity 1106000
S.NoMaterialQuantityUnit PriceTotal
12048-Construction of gravel ba11000010000
2Board130003000
3Compaction18000080000
4contangency and work charges140004000
5Kilometre Stone (ordinary)136103610
6pipe2.538009500
7Transportation charges1304000304000
Total Material 415000