Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 12:41:52 AM 
Back  
State: MADHYA PRADESH District: DHAR Block: BADNAWAR Panchayat: Khachroda
Work Code: 1722001064/RC/22012034214041 (सी.सी. रोड (कालुराम पाटीदार के मकान से बाबुलाल बाग)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2013 Work start date : 24/2/2014
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 596/64 Sanction Date : 14/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
138141.53832 94858.46168 0 0 266378.27548 0 0 362000 0 499378.27548
Financial Sanction Details
Financial\Administrative Sanction No: 12/64 Financial\Administrative Sanction Date 4/3/2014
Fin. Sanc. Amt. (in Rs) NREGA:232999.72452 Panchparmeshwar
266378.27548
Scheme 2
0
Scheme 3
0
Total
500000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard115001500
2Dag-beling-Double spade "v" shaped stroke 100mm deep400.750.5200.375
3Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead240.78287.621092.5032
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)72.152806.6202496.19
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)70.82190155052
6Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used75.1526.61998.99
7False work for R.C.C. and P.C.C. work in plinth and foundation291.05127.136992.455
8Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)238.7666.21480.3492
9Transportation of metal 145.466108.1815736.51188
10Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.145.466415964.106
11Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN82.5816.81387.344
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work240.78281.219551.4984
13Collection of hard moorum including stacking at quarry.145.466130.819026.9528
14contingency16899116899
Total Activity 500000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL70.74469.1233185.5488
240 mm Metal67.41332.4222408.4322
3Cement809285230565
4contangency and work charges16884116884
5FALSE WORK191.0573.514042.175
6Hire charges of Roaler82.5816.81387.344
7SAND66.1472.9531261.995
8SIGNBOARD NO115001500
9Transpotation Charges145.46668.7610002.24216
Total Material 362000