State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: KONDAWAD
Work Code: 1725006031/IF/02 (कपिलधारा कुप निर्माण कार्य सह मेढबंधान शिवलाल जाधव)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 15/12/2011 Work start date : 29/12/2011
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 000.881 Sanction Date : 29/12/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
98000 52000 0 0 0 0 0 52000 0 150000
Financial Sanction Details
Financial\Administrative Sanction No: 000.01/14 Financial\Administrative Sanction Date 29/12/2011
Fin. Sanc. Amt. (in Rs) NREGA:150000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
150000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil9086.257762.5
2Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)5.092557.613018.184
3False work for R.C.C. and P.C.C. work in plinth and foundation102128.613117.2
4Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars15051.77755
5Transportation of metal 11109511095
6Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil22.6775.31707.051
7Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum22.67117.12654.657
8Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)43.34226.379810.8758
9Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.158.4393.362298.72
10work charge20100020000
Total Activity 150000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL48143256
2Board1100100
3BULLOCK CART154006000
4Cement1250250
5Cement(bori)4030512200
6Centering and Shuttering85907650
7CONTANGANCY111
8dewatering111
9Display board115001500
10hol130709100
11MASON (PERDAY)1435435
12Photocopy & staionary1300300
13sand (t)27351470
14STEEL15060.29030
15transportation1300300
16Transportation charges1100100
17Water Supply3100300
Total Material 52000