S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | (a) 0.5 Km. Lead | 78 | 102.351538461538 | 7983.42 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 1250 | 2.625456 | 3281.82 |
3 | b (iii) Dense or hard soil for Tank Work | 384 | 134.1875 | 51528 |
4 | c (iii) Hard moorum for Tank Work | 576 | 178.737743055556 | 102952.94 |
5 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 288 | 568.948229166667 | 163857.09 |
6 | (c) Hard moorum | 207 | 161.669082125604 | 33465.5 |
7 | 22cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum | 150.8 | 352.67301061008 | 53183.09 |
8 | Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine. | 1000 | 3.60018 | 3600.18 |