S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works) | 65.87 | 127.23 | 8380.6401 |
2 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 200 | 36.6 | 7320 |
3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 57.22 | 97.8 | 5596.116 |
4 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 38.41 | 75.3 | 2892.273 |
5 | Labour only for item no.0402 | 80 | 30 | 2400 |
6 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 164 | 450.45 | 73873.8 |
7 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size) | 5.5 | 2557.6 | 14066.8 |
8 | False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift | 88 | 155.9 | 13719.2 |
9 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 150 | 51.7 | 7755 |
10 | Providing and fixing turn buckets and straining bolts for barbed wire fencing. | 40 | 74.9 | 2996 |
11 | Renewing Bars, stiles on rails, straight for joinery upto 50mm thick including meters, haunchings, mortises, etc. and removing old defective pieces.-Bija wood | 31.79 | 221.7 | 7047.843 |
12 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed-Hard moorum for Road Work | 40 | 76.3 | 3052 |