S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 27 | 882 | 23814 |
2 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 22.5 | 3307.4 | 74416.5 |
3 | Coursed rubble masonry second sort in plinth and foundation.-In Cement mortar 1:8 (1cement, 8sand) | 202.5 | 1858.1 | 376265.25 |
4 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Ruled pointing | 450 | 78.5 | 35325 |
5 | Transportation of metal | 46.12 | 419.7 | 19356.564 |
6 | Transportation of sand | 95.75 | 377.73 | 36167.6475 |
7 | Transportation rates for Masonry stone. | 202.5 | 384.58 | 77877.45 |
8 | Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock. | 8.91 | 123.09 | 1096.7319 |
9 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 15.4 | 177.93 | 2740.122 |
10 | SIGN BOARD | 1 | 5000 | 5000 |
11 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 382.5 | 52.7 | 20157.75 |
12 | contingency | 1 | 6582.9846 | 6582.9846 |