S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 459.3 | 45.2 | 20760.36 |
2 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms. | 11.5 | 166.06 | 1909.69 |
3 | FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders | 12.5 | 632.6 | 7907.5 |
4 | Lossening of hard soil by ploughing the existing gound | 1089.6 | 2.7 | 2941.92 |
5 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 1089.6 | 50 | 54480 |
6 | Field Technical Supervisior Charge-FTSC | 1 | 3000 | 3000 |