S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | (III) Lead upto 200 meters | 4 | 110.3525 | 441.41 |
2 | (j) Cement mortar 1:6 (1cement, 6sand) | 0.51 | 3926.60784313725 | 2002.57 |
3 | (XV) 10 Km. Lead | 1.2 | 210.633333333333 | 252.76 |
4 | c (iii) Hard moorum for Tank Work | 7.2 | 181.559722222222 | 1307.23 |
5 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 4 | 163.5675 | 654.27 |
6 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 1.2 | 228.125 | 273.75 |
7 | Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry. | 0.51 | 186.098039215686 | 94.91 |