S.No | Material | Quantity | Unit Price | Total |
1 | 0002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper | 0.0127365 | 1000 | 12.7365 |
2 | 0084-Hire charges of Diesel truck - 9 tonne (without POL) | 1.74634421 | 2100 | 3667.322841 |
3 | 0367-Portland Cement | 0.0509463 | 6400 | 326.05632 |
4 | 0368-White cement | 0.0002189 | 15626 | 3.4205314 |
5 | 0983-Fine sand (zone IV) | 0.1389611 | 1025 | 142.4351275 |
6 | 1235-Diesel oil | 7.0552306 | 100 | 705.52306 |
7 | 3-Display Board / CIB | 1 | 2500 | 2500 |
8 | 5001-Mobil oil | 0.24448819 | 270 | 66.0118113 |
9 | 7900-Modular common burnt clay bricks of class designation 7.5 | 150.8 | 4.13 | 622.804 |
10 | MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT | 0.052 | 525 | 27.3 |
11 | MR6032-Snowcem/ durocem | 0.0004179 | 27789 | 11.6130231 |
12 | MR6034-Blaster (Semi-Skilled) | 0.9 | 351 | 315.9 |
13 | MR6035-Gelatine (80%) | 17.1 | 65.6 | 1121.76 |
14 | MR6036-Electric detonator | 90 | 16.4 | 1476 |
15 | MR6037-Fuse coil (10m long) | 27 | 8.2 | 221.4 |
16 | MR6038-Drilling of holes 25mm dia 0.75m deep | 67.5 | 61.51 | 4151.925 |
17 | MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry) | 0.0192 | 682 | 13.0944 |
18 | MR6101-Boulder - picked up (1807) | 90 | 147 | 13230 |