S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Dag-beling-Single spade stroke minimum 75mm deep | 600 | 0.3 | 180 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 13.5 | 3269.6 | 44139.6 |
3 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 312.75 | 983.7 | 307652.175 |
4 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 100 | 65.9 | 6590 |
5 | Pointing on CR masonry with cement mortar 1:4(1cement, 4sand)-Flush pointing | 1080 | 62.8 | 67824 |
6 | Providing and fixing M.S. fan clamps of 16mm dia mild steel in existing RCC slab including cutting chase and making good. | 33.75 | 871 | 29396.25 |
7 | Collection of puddle earth including stacking at quarry | 625 | 95 | 59375 |
8 | Transportation of 20 MM metal | 17.21 | 200.61 | 3452.4981 |
9 | Transportation of sand | 12.81 | 200.61 | 2569.8141 |
10 | Transportation rates for Masonry stone. | 312.75 | 227.5 | 71150.625 |
11 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 767.49 | 101.61 | 77984.6589 |
12 | Loading of metal in truck, dumper etc. | 625 | 28.26 | 17662.5 |
13 | Unloading of metal in truck, dumper etc. | 625 | 14.13 | 8831.25 |
14 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 625 | 44.1 | 27562.5 |
15 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 168.75 | 95 | 16031.25 |
16 | contingency | 1 | 41233.88 | 41233.88 |