State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: BILANKHEDA
Work Code: 1725006013/RS/22012034489408 (GKRA सामुदाईक स्वछता परिसर निर्माण कार्य स्कूल के पास बिलनखेड़ा)
Work Category: Rural Sanitation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 20/4/2020 Work start date : 29/7/2020
Present status : Not Exist Proposed Status : Construction of Community Sanitary Complex
Tech Sanction Details
Technical Sanction No. : BI 11 Sanction Date : 30/6/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost 14th Fianance Commission SBM scheme3 Total
75000 0 0 0 210000 90000 0 300000 0 375000
Financial Sanction Details
Financial\Administrative Sanction No: BI/2369 Financial\Administrative Sanction Date 14/7/2020
Fin. Sanc. Amt. (in Rs) NREGA:75000 14th Fianance Commission
210000
SBM
90000
Scheme 3
0
Total
375000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil8.271391149.53
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum6.911841271.44
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)82941.323530.4
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)205173.6103472
5False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift90212.919161
6Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:5 (1cement, 5sand)253933.398332.5
7Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height25077.519375
8Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars120060.872960
9work charge13539035390
Total Activity 375000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL08500
2Bricks500000
3CEMENT (Beg)7500
4सम्‍पुर्ण सामाग्री क्रय1300000300000
Total Material 300000