S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 4 | 3235.4 | 12941.6 |
3 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size) | 35.21 | 4253 | 149748.13 |
4 | Brick bat filling in trenches or soak pits. | 6.75 | 325.6 | 2197.8 |
5 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 4 | 4000 | 16000 |
6 | Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-40 mm thick. | 31.32 | 1645 | 51521.4 |
7 | Earth work for well excavation-Lift from 1.5 m. to 2.00 m. | 75.36 | 186 | 14016.96 |
8 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 25.12 | 523 | 13137.76 |
9 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 12.50 m. to 13.00 m. | 76.75 | 74 | 5679.5 |
10 | Earth work for well excavation-Hard rock requiring blasting lift from 3.00 m. to 3.50m. | 22.08 | 588.7 | 12998.496 |
11 | Earth work for well excavation-Hard rock requiring blasting lift from 5.50 m. to 6.00 m. | 19.23 | 676.3 | 13005.249 |
12 | Earth work for well excavation-Hard rock requiring blasting lift from 3.50 m. to 4.00 m. | 19.23 | 698.2 | 13426.386 |
13 | Earth work for well excavation- Hard rock requiring blasting lift from 4.00 m. to 4.50 m. | 52.08 | 676.6 | 35237.328 |
14 | Earth work for well excavation-Hard rock requiring blasting lift from 4.50 m. to 5.00 m. | 52.08 | 682.5 | 35544.6 |
15 | Earth work for well excavation-Hard rock requiring blasting lift from 5.00 m. to 5.50 m. | 52.23 | 654.4 | 34179.312 |
16 | Earth work for well excavation-Hard rock requiring blasting lift from 6.00 m. to 6.50 m. | 11.87 | 699 | 8297.13 |
17 | Earth work for well excavation-Hard rock requiring blasting lift from 6.50 m. to 7.00 m. | 11.87 | 725.7 | 8614.059 |
18 | Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works) | 11 | 6035.35 | 66388.85 |
19 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work | 55 | 145.8 | 8019 |
20 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Loose or soft soil for Tank Work | 55.12 | 566.8 | 31242.016 |