Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 12:45:29 AM 
Back  
State: MADHYA PRADESH District: DHAR Block: BADNAWAR Panchayat: Khachroda
Work Code: 1722001064/WC/22012034663726 (CTRA ROOF WATER HARVESTING पंचायत भवन खाचरोद )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 1/4/2021 Work start date : 17/4/2021
Present status : Non-existent Proposed Status : Construction of Recharge Pits for Community
Tech Sanction Details
Technical Sanction No. : 1722001/2021-2022/155544/TS Sanction Date : 18/4/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
6505.64 11025.89 481.24 877.22 0 0 0 12400 0 18889.99
Financial Sanction Details
Financial\Administrative Sanction No: 1722001/2021-2022/155544/AS Financial\Administrative Sanction Date 19/4/2021
Fin. Sanc. Amt. (in Rs) NREGA:18890 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
18900
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(j) Cement mortar 1:6 (1cement, 6sand)1.583873.860759493676120.7
2(b) Cement mortar 1:4 (1cement, 4sand)26.8111.2902985074632982.58
3Providing and fixing on wall face unplasticised Rigid PVC Rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. (ii) 110 mm diameter (minimum wall thickness 2.2mm)15231.1006666666673466.51
4(a) Loose or soft soil8.190.8074074074074735.54
5(b) Dense or hard soil9.9148.3333333333331468.5
6Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.5.4163.566666666667883.26
7Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.5.4228.1222222222221231.86
8Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry.5.4185.3759259259261001.03
Total Activity 17900
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.031388527.7005
20367-Portland Cement0.19555111074.645
30983-Fine sand (zone IV)0.67051076.25721.625625
47900-Modular common burnt clay bricks of class designation 7.5821.64.133393.208
58-BFT/TA/Mate110001000
6MR11640-uPVC Pipe (Working Pressure 4kg/cm square) single socketed pipe 110mm dia151602400
7MR11641-uPVC Pipe (Working Pressure 4kg/cm square) rubber (seal) ring 100mm dia2.52562.5
Total Material 8700