S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 3000 | 3000 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 1250 | 1.8 | 2250 |
3 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 500 | 0.5 | 250 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 37.5 | 2384.8 | 89430 |
5 | Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing. | 225 | 196.6 | 44235 |
6 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 112.5 | 983.7 | 110666.25 |
7 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Raised and cut pointing | 113.8 | 275 | 31295 |
8 | Collection of hard metal other then black trap basalt and granite for building work (without blasting) .-40 mm nominal size | 13.65 | 355.8 | 4856.67 |
9 | Stacking without boxing.-Puddle earth, moorum, sand or kankar | 18.9 | 108.3 | 2046.87 |
10 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Hard moorum | 243.75 | 95 | 23156.25 |
11 | Collection of size stone for coursed rubble masonry rectangular in shape (maximum size 0.014cum to 0.06cum) including 20%headers.-Other than black trap Basalt or granite | 45 | 556.9 | 25060.5 |
12 | contingency | 1 | 48753 | 48753 |