State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: JAWASA
Work Code: 1702001018/RC/22012034188113 (c.c. road jabsa marg ls Murai sharma ke or)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2013 Work start date : 3/10/2013
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 107/18 Sanction Date : 10/9/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
106200 70800 0 0 323000 0 0 394000 0 500000
Financial Sanction Details
Financial\Administrative Sanction No: 05/18 Financial\Administrative Sanction Date 11/9/2013
Fin. Sanc. Amt. (in Rs) NREGA:177000 Panchparmeshwar
323000
Scheme 2
0
Scheme 3
0
Total
500000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Contingency122385.1622385.16
3Dag-beling-Single spade stroke minimum 75mm deep4920.4196.8
4Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.91.63456.441819.932
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)105.612843.3300280.913
6False work for R.C.C. and P.C.C. work in plinth and foundation191.09121.823274.762
7Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)291.9261751.52
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 13540.593540.59
9Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.89612.554512.5
10Transportation rates for Masonry stone.130608.1230608.12
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work124.3373.49125.822
12Labour difference in case of old SoR110001.7410001.74
Total Activity 500000
S.NoMaterialQuantityUnit PriceTotal
1Cement274258.570829
2Convergence Amount1323000323000
Total Material 394000